Project List

Below is a small list of some of our work. For the full list please download our company profile.

  • Nestle Trinidad Limited – Fire Ring Main System
    Installation of 3,000m of 8” diameter fire mains with 24 hydrants, a fire pump house and the installation of diesel driven 1,000gpm fire pump.
  • Ibis Gardens Housing Development – Caroni, Wastewater Treatment Plant. On going
    Contracted by the Housing Development Corporation to design, construct, operate and maintain a new Wastewater Treatment Plant to replace the existing plant.
  • Strikers Village Wastewater Treatment Plant, Point Fortin – Design and Construction of Refurbishment Works.
    Decommissioning of the existing wastewater treatment plant and the Design and Construction of a new wet well and pump house and the installation of new pumps and electrics together with the construction of sewer force main and gravity mains for the Water and Sewerage Authority.
  • Nestle Trinidad Limited – Refurbishment of Wastewater Treatment Plant.
    Replacement of feed pumps, installation of new fine screen, complete replacement of aeration system and blowers and the installation of a new Dissolved Air Floatation (DAF) clarifier for the Valsayn plant.
  • Gomez Trace Housing Development – Moruga, Wastewater Treatment Plant and Pumping Station. On going
    Contracted by the Housing Development Corporation to design, construct, operate and maintain a Wastewater Treatment Plant and a pumping station at Gomez Trace, Moruga, for a 150 units housing development.
  • Mora Heights Housing Development – Rio Claro, Wastewater Treatment Plant and Pumping Stations. On Going
    Contracted by the Housing Development Corporation to design, construct, operate and maintain a Wastewater Treatment Plant and three (3) pumping stations at Mora Heights, Rio Claro, for a 250 units housing development
  • Santa Monica Wastewater Pumping Station – Design and Construction of Refurbishment Works. 
    Design and construction of a new wet well and pump house and the installation of duplex submersible pumps and electrics for the Water and Sewerage Auhority.
  • Paramin Water Booster Pumping Station – Design and Construction.
    Design and construction of a duplex Vertical Turbine Pumping station for the Water and Sewerage Auhority.
  • Debe Wastewater Treatment Plant – Refurbishment and Expansion of the Plant.
    Refurbish the equipment of the existing plant and expand the plant capacity from 60,000 gpd to 240,000 gpd by the addition of a US Filter/ Davco 120,000 gpd plant. Complete new electrical power and control systems and supply and installation of ultraviolet disinfection system.
  • Arima Wastewater Treatment Plant – Refurbishment of Primary and Secondary Clarifiers.
    Removal of the existing clarifier equipment for four (4) 44ft diameter clarifier and design and installation of a modern clarifier sludge collection mechanism and drive motor including all painting, mechanical and electrical works.
  • San Fernando Wastewater Treatment Plant – Refurbishment of Primary and Secondary Clarifiers.
    Removal of the existing clarifier equipment for four (4) No. 84ft diameter clarifiers and design and installation of a modern clarifier sludge collection mechanisms and drive motors including all painting, mechanical and electrical works.
  • Mora Heights Housing Development – Rio Claro, Infra-structure Designs for 250 housing Units.
    Designs of roads, drainage, water distribution system, the wastewater collection system including sewage pump stations, and the wastewater treatment plant.
  • Harmony Hall Wastewater Treatment Plant
    Contracted by the Land Settlement Authority to design, construct, operate and maintain a Wastewater Treatment Plant at Harmony Hall, Gasparillo, for a 600 units housing development
  • Tyrell Bay Marina and Boatyard - Carriacou, St.Vincent and the Grenadines
    Feasibility study for the development of a marina with fully serviced berths for 80 vessels and a landside boatyard for storage and repairs for 100 vessels. Design of the marine elements of the project consisting of dredging and reclamation requirements, finger piers, sheet pile quay face and haul-out facility. Design of the land base elements of the project consisting of earthworks, drainage, desalination plant for potable water, wastewater collection system including treatment and disposal system and workshop buildings and structures.